• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Vintage FM

60's 70's 80's Penrith Camden Campbelltown Picton Penrith St Marys Richmond Windsor Radio Station - It's All About The Music!

Click to Listen Live Click to Listen Live
  • Home
  • On Air
    • Kevin
    • John Bond
    • Wilmo
    • Brian Campbell
    • Artie Stevens
  • News
  • Advertise
    • Business Directory
  • WIN
  • Events
    • Event Submission
  • Contact
    • FAQ
    • Feedback
    • Delivery Policy Refund Policy
    • Terms and Conditions
  •  
You are here: Home / News / Roadwork Begins in Penrith

April 30, 2019 By Kevin Graham

Roadwork Begins in Penrith

Bridge upgrade

UPDATE: MOST UP TO DATE INFORMATION HERE: https://vintagefm.com.au/castlereagh-road-closure-september-6th-9th/

April 30 2019: Motorists are advised of changed traffic conditions from this Wednesday on Mulgoa and Castlereagh roads at Penrith for road and bridge upgrade work to be carried out.

This work is being carried out as part of the upgrade of Mulgoa Road at Penrith between Union Road and Museum Drive.

Work will be carried out between Wednesday 1 and Friday 31 May from 7am to 6pm on weekdays and Saturdays from 8am to 1pm, weather permitting.

Some night work will also be carried out between 9pm and 6am.

To allow work on the railway bridge to be carried out safely, Castlereagh Road will be closed between Jane Street and Museum Drive from 10pm Friday 24 to 6am Monday 27 May.

While the closure is in place, motorists will be detoured via Great Western Highway, Coreen Avenue and The Northern Road. (Please note: Coreen Ave is for light vehicles only – Trucks must use Andrews Rd)

Pedestrian and cyclist access will be maintained while the road closure is in place.

At other times, lane closures will be in place on the southbound lanes between Museum Drive and Jane Street and may affect travel times.

During lane closures, traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists in the vicinity of the works.

Motorists are advised to drive to the conditions and follow the direction of signs and traffic control.

Roads and Maritime Services thanks motorists for their patience during construction work.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

Filed Under: News Tagged With: castlereagh rd, mulgoa rd, nsw, Penrith, roadwork, traffic, Train, upgrade

Previous Post: « ANZAC Day Services 2019
Next Post: Rossco’s Cafe De Wheels »

Primary Sidebar

Upcoming Events

Jan 24
9:00 am - 7:00 pm

End Of An Era Party – Mt Druitt Swimming Centre

Jan 26
8:00 am - 12:00 pm

Wollondilly – Australia Day

View Calendar

Footer

iheart radio logo

Dawson Street Media Pty Ltd
Barry ParsonsĀ  Email

Contact Us

Programming Email

Sales / Advertising Enquiries Email

 

Follow Us

  • Email
  • Facebook

Copyright © 2026 · VintageFM · Website Built, Hosted & Secured by < SYDNEY WEB +TECH /> · PRIVACY